Mon, Nov 23, 2026 • 4:33 AM Nepal Time • Kathmandu, Nepal
Nepal's official documents — original, verified, in one place

All documents

Nepal Accelerates Power Restoration After Bhotekoshi Floods, Reports 431.1 MW Hydropower Shutdown and Major Transmission Damage

Nepal’s Ministry of Energy, Water Resources and Irrigation has outlined emergency measures to restore electricity in flood-affected Rasuwa, Nuwakot and Dhading districts, reporting the shutdown of 12 hydropower projects totaling 431.1 MW, extensive transmission damage and plans to distribute 500 solar power banks.

Read More »

Subscribe to Official Government Alerts

Get new government notices, circulars, and policy updates delivered to your inbox as soon as they are published.
Subscription Form